Peak Forest - Bridge 36, New Road Bridge
Detail
From Date: 12/12/2018 08:00
To Date: 12/12/2018 17:00 inclusive
Type: Navigation Restriction
Reason: 3rd Party Works
Is the towpath closed? No
Location
Closest waterway: Peak Forest Canal
Starts at: Bridge 36, New Road Bridge
Ends at: Bridge 36, New Road Bridge
Upstream winding hole: Whaley Bridge Basin
Downstream winding hole: Between bridges 28 & 29
Description
Third party contractors will be carrying out an inspection of the bridge. The canal will be restricted due to the use of a floating pontoon.
All boat traffic should slow down, approach the bridge with caution and be prepared to stop if requested. Short delays up to 10/15 minutes may be necessary for contractors to move the floating pontoon.
Towpath users should proceed with caution. Banksmen and warning signs will be in place.