Closure Bingley 5 Rise to River Lock - low water levels

Notice Details
From Date:
17th August 2018 at 08:00
To Date:
until further notice
Type:
Navigation Closure
Reason:
Water resources
Description:

Due to the continued drawdown of the river levels, the prolonged low rainfall and with the forecast for further dry weather, the Trust will be implementing temporary closures to navigation between Bingley 5 Rise Top Lock(Lock 29) to River Lock (Lock 1) at the beginning of the Leeds and Liverpool Canal, commencing on Friday 17th August. 

The main lock flights will be padlocked closed at Bingley Three and Five Rise (Locks 22-29), Field (Locks 16-18), Newlay (Locks 11-13), Forge (Locks 8-10) and the gates will be ashed up to reduce leakage.  Additionally to prevent unauthorised use, measures will be taken to make all the locks inoperable within this section.  

It’s not clear how long the closure will last for but it’s likely to be throughout August and potentially beyond if there is no significant, sustained rainfall. While the closure will prevent use of that stretch of canal by boats the towpath will remain open for visitors and the local community alike to enjoy.

The canal will remain open between Holme Bridge, Gargrave and the top of the Bingley 5 Rise Locks, approximately 20 miles

Location:
Leeds & Liverpool Canal
Starts At:
Lock 29, Bingley 5 Rise Top Lock
Ends At:
Lock 1, River Lock
Search again

Notice Location