Foundary Shoal Bridge Inspection
Detail
From Date: 19/11/2018 08:00
To Date: 20/11/2018 18:00 inclusive
Type: Navigation Restriction
Reason: 3rd Party Works
Is the towpath closed? No
Location
Closest waterway: Wakefield Branch (Aire & Calder)
Starts at: Bridge 1, Foundary Shoal
Ends at: Bridge 1, Foundary Shoal
Description
Contractor (Spartan Rescue) is carrying out an inspection at Foundary Shoal bridge using a floating pontoon and fixed scaffold in the watercourse.
Delays will be no longer than 20 minutes to boating traffic as the pontoon can be safely moved out of the navigation.
Can skippers of all craft please slow down when approaching the bridge and following instructions given by staff on site.