10th September 2018
at 08:00
14th September 2018
at 17:00
inclusive
Contractors are carrying out an inspection of Greasborough Road Bridge from a floating pontoon.
Please slow down on the approach to the bridge and be prepared to stop if requested whilst the pontoon moves out of the way. Delays of up to 20 minutes may be expected.
Boat traffic will have priority