Friars Gate Bridge

Notice Details
From Date:
8th August 2018 at 07:00
To Date:
14th December 2018 at 07:00 inclusive
Type:
Navigation Restriction
Reason:
3rd Party Works
Description:

Contractors (Amco) are carrying out bridge strengthening works and require an encapsulated scaffold over the watercourse.
The watercourse will be restricted at this location in width due to the scaffold at either the side of the structure however boats will still be able to navigate through during the works as sufficient width will be left for navigating.

Please slow down when approaching bridge and be prepared to stop if requested.  Delays not exceeding 15-20 minutes.

Location:
Sheffield & South Yorkshire Navigations
Starts At:
Bridge 71, Friars Gate
Ends At:
Bridge 71, Friars Gate
Search again

Notice Location