Vale Royal Locks, River Weaver, Northwich
Detail
From Date: 20/06/2018 08:00
To Date: 21/06/2018 18:00 inclusive
Type: Navigation Closure
Reason: 3rd Party Works
Is the towpath closed? No
Location
Closest waterway: Weaver Navigation
Starts at: Vale Royal Small Lock
Ends at: Vale Royal Small Lock
Updates
05/06/2018 10:13
Owing to a later start date on site, the dates of the lock closure have changed. The stoppage will now take place on 20th & 21st June.
Description
Navigation through the locks will not be possible. The newly refurbished swing bridge will be delivered and installed using heavy lifting gear then balanced and adjusted.