Ashted Tunnel, Birmingham
Detail
From Date: 04/06/2018 08:00
To Date: 05/06/2018 18:00 inclusive
Type: Towpath Closure
Reason: Inspection
Is the towpath closed? Yes
Location
Closest waterway: Digbeth Branch (Birm'm & Fazeley)
Starts at: Ashted Tunnel North Portal
Ends at: Ashted Tunnel North Portal
Description
Contractors Severn Partnership will be undertaking a detailed 3D survey of the tunnel. To undertake the survey safely the towpath through the tunnel will need to be closed. A division route and signage will be in place during the closure.