Between Bridge 101 Malkins Bridge and Bridge 102 Meaford Hall Farm Bridge
Detail
From Date: 16/05/2018 08:00
To Date: 18/05/2018 23:00 inclusive
Type: Towpath Closure
Reason: 3rd Party Works
Is the towpath closed? Yes
Location
Closest waterway: Trent & Mersey Canal
Starts at: Bridge 101, Malkins Bridge
Ends at: Bridge 102, Meaford Hall Farm Bridge
Updates
17/05/2018 13:57
The towpath closure is no longer required but emergency repairs are being carried out on site until 11pm on Friday 18th May. Overhead works are taking place and boaters and pedestrians should approach with caution.
Description
Third party contractors will need to carry out emergency repairs to the overhead power lines.
Contractors will be working on the towpath and installing temporary scaffolding.
The canal will remail open.
Boaters should approach with caution and should be prepared to stop if requested.