Between Penawr Bridge 150 and Cross Oak Bridge 147, Monmouthshire & Brecon Canal

Notice Details
From Date:
4th February 2019 at 08:00
To Date:
15th March 2019 at 16:00 inclusive
Type:
Navigation Closure
Reason:
Repair
Notice updates:
20/12/2018 @ 17:04

Our engineers have reviewed the design of the works to repair the failed timber edge between Penawr Bridge 150 and Cross Oak Bridge 147.  We are pleased to confirm this has resulted in a revised methodology which means the duration of the navigation closure has been reduced to just six weeks.  Please note the new start date for the stoppage.

Description:
Repairs to failed timber edge
Location:
Monmouthshire & Brecon Canal
Location:
Between Penawr Bridge 150 and Cross Oak Bridge 147, Monmouthshire & Brecon Canal
Up Stream Winding Hole:
Pencelli Bridge 154
Down Stream Winding Hole:
Talybont Wharf
Search again

Notice Location