Lock 2, Northgate Middle Lock, Chester, Shropshire Union Canal
Detail
From Date: 11/02/2019 08:00
To Date: 08/03/2019 16:00 inclusive
Type: Navigation Closure
Reason: Repair
Is the towpath closed? No
Location
Closest waterway: Shropshire Union Canal
Starts at: Bridge 123J, Railway
Ends at: St Oswald Way Flyover Bridge
Upstream winding hole: Cow Lane, Bridge 123E, Shropshire Union Canal
Downstream winding hole: East of Backford Bridge133 (A41) or Bridge 123L, Tower Wharf, Shropshire Union Canal
Updates
01/10/2018 17:51
Following further investigation it has been decided to take the opportunity to replace the lock gate at Lock 2, Northgate Middle Lock, rather than refurbishing.
The duration and timing of the navigation closure is not affected.
Description
Replacement or refurbishment of the mitre lock gates |