Between Zouch Lock and the Zouch Flood Gates

Notice Details
From Date:
12th March 2018 at 08:00
To Date:
16th March 2018 at 17:00 inclusive
Type:
Navigation Closure
Reason:
Maintenance
Notice updates:
01/03/2018 @ 16:08

We apologise for the change in dates, please see update below.

There is a serious leak from the navigation just upstream of Zouch Lock which requires urgent attention.

In order to carry out repairs we need to dewater the section of navigation between Zouch Lock and the flood gates, which are about ½ mile upstream.  We will achieve this by closing the flood gates and draining the navigation through the lock, allowing our team to carry out repairs to the canal wall.

The works will commence on Monday 12th March at 8:00am and we aim to be completed by Friday 16th March at 5:00pm.

Description:

There is a serious leak from the navigation just upstream of Zouch Lock which requires urgent attention.

In order to carry out repairs we need to dewater the section of navigation between Zouch Lock and the flood gates, which are about ½ mile upstream.  We will achieve this by closing the flood gates and draining the navigation through the lock, allowing our team to carry out repairs to the canal wall.

The works will commence on Monday 19th March at 8:00am and we aim to be completed by Friday 23rd March at 5:00pm.

Location:
River Soar
Starts At:
Lock 55 - Zouch Lock
Ends At:
Zouch Flood Gates
Search again

Notice Location