Lee Navigation, bridge 22

Notice Details
From Date:
12th January 2018
To Date:
23rd February 2018 at 23:59 inclusive
Type:
Navigation Restriction
Reason:
3rd Party Works
Description:

Following the winter stoppage 5-12 January. Network Rail Contractor, Volker Fitzpatrick have identified safety concerns requiring additional repair works to off-side abutment. Modular pontoon sections and scaffolding will be positioned in the navigation to assist with the works. Advanced warning signage, along with a 10m clear width will be available for boats to navigate safely.

Location:
Lee Navigation
Starts At:
Bridge 22 (Railway)
Ends At:
Bridge 22 (Railway)
Search again

Notice Location