Rail Bridge 74a

Notice Details
From Date:
18th January 2018 at 08:00
To Date:
19th January 2018 at 15:45 inclusive
Type:
Navigation Restriction
Reason:
3rd Party Works
Notice updates:
19/01/2018 @ 15:45
Please be advise that the inspection has been postponed
Description:

Please be advised that navigation will be restricted in this area as contractors will be undertaking an Inspection of Railway Bridge 74a, from a floating pontoon

Please slow down when entering the area and abide by any instructions given by the contractors, be prepared to stop whilst the pontoon is moved out of the way

Thank you for your patience

Location:
Leeds & Liverpool Canal
Starts At:
Bridge 74A, Railway Bridge
Ends At:
Bridge 74A, Railway Bridge
Search again

Notice Location