Repairs - banks of river - South Accommodation Bridge

Detail

From Date: 13/12/2017 08:00

To Date: 21/12/2017 17:00 inclusive

Type: Navigation Restriction

Reason: 3rd Party Works

Is the towpath closed? No

Location

Closest waterway: Aire & Calder Navigation Main Line

Starts at: South Accommodation Bridge

Ends at: South Accommodation Bridge

Description

Contractors (DSMC) are carrying out a repairs to the banks of the river by South Accommodation Bridge using diving techniques.

The watercourse will be restricted at this location due to divers in the river.  All boat traffic should slow down when approaching and take care when passing and abide by the contractors advice.

This may result in delays of no longer than 15-20 minutes.