Lee Navigation, Bridge 22
Detail
From Date: 14/08/2017 00:00
To Date: 27/10/2017 23:59 inclusive
Type: Navigation Restriction
Reason: 3rd Party Works
Is the towpath closed? No
Location
Closest waterway: Lee Navigation
Starts at: Bridge 22 (Railway)
Ends at: Bridge 22 (Railway)
Description
Network Rail Contractor, Volker Fitzpatrick will be undertaking Bridge Strengthening repair works.
Works will be undertaken from barges positioned under the bridge, within Navigation. This will be done in two half phases to ensure a clear width of 10m is available at all times, for boats to navigate safely.