Towpath mooring between Bridge 7Ba and Scrubbs Lane bridge (Bridge 6), Paddington Arm

Detail

From Date: 14/03/2017 07:00

To Date: 14/04/2017 19:00 inclusive

Type: Towpath Closure

Reason: (Re)Construction

Is the towpath closed? No

Location

Closest waterway: Paddington Arm (Grand Union Canal)

Starts at: Bridge 7Ba (Footbridge)

Ends at: Bridge 6, Scrubbs Lane (A219)

Updates

28/02/2017 09:49

We will be carrying out resurfacing and widening works on the Paddington Arm's towpath. This will increase the amount of space for all users and improve the condition of the towpath surface.

The works will require workboats to be moored alongside the towpath. In addition, the towpath is due to be excavated within close proximity of the canal edge. Therefore, towpath mooring is to be suspended between Bridge 7Ba and Scrubbs Lane bridge (Bridge 6) from 14 March to 14 April 2017. Winter moorings will be unaffected.

Description

We will be carrying out resurfacing and widening works on the Paddington Arm's towpath. This will increase the amount of space for all users and improve the condition of the towpath surface.

The works will require workboats to be moored alongside the towpath. In addition, the towpath is due to be excavated within close proximity of the canal edge. Therefore, towpath mooring is to be suspended between Bridge 7Ba and Scrubbs Lane bridge (Bridge 6) from 14 March to 14 April 2017. Winter moorings will be unaffected.