Lock 6/7 Perry Barr Lock Flight
Detail
From Date: 16/02/2017 08:00
To Date: 24/02/2017 23:59 inclusive
Type: Navigation Restriction
Reason: Repair
Is the towpath closed? Yes
Location
Closest waterway: Tame Valley Canal
Starts at: Perry Barr Lock 7
Ends at: Perry Barr Lock 7
Description
Emergency repair works to repair a lock wall leak between Lock 6 and Lock 7. Works have been planned to coincide with current stoppage on the Tame Valley Canal at Spouthouse Aqueduct to minimise impact on the waterway. The pound between the two locks will be lowered to enable repair works to the off-side waterway wall.