Bridge 70A Painting Works
Detail
From Date: 28/02/2017 09:00
To Date: 03/03/2017 16:00 inclusive
Type: Navigation Restriction
Reason: 3rd Party Works
Is the towpath closed? No
Location
Closest waterway: Macclesfield Canal
Starts at: Bridge 70A
Ends at: Bridge 70A
Description
Contractors (J Murphy & Sons) are carrying bridge painting works under the Bridge. The canal will be restricted at this location due to the use of a floating pontoon.
All boat traffic should slowdown, approach the bridge with caution and be prepared to stop if requested. Short delays up to 10/15 minutes may be necessary for contractors to move the floating pontoon.