Lock 6, Fenns Lock, Stockton Brook
Detail
From Date: 25/02/2014 07:30
To Date: 27/02/2014 16:00 inclusive
Type: Navigation Closure
Reason: Repair
Is the towpath closed? No
Location
Closest waterway: Caldon Canal
Starts at: Lock 6 Fenns Lock
Ends at: Lock 6 Fenns Lock
Upstream winding hole: above Bridge 27 Doles Bridge
Downstream winding hole: Below Bridge 22 Heakley Hall Bridge
Description
Emergency Grouting works : Works are required to seal a new water leak around the top end gate to prevent further damage through the forthcoming season. To be able to protect the ground paddle and culvert during this work the forebay of the lock chamber will need to be drained.
The stoppage will be in place between 0730-1600hrs for each of the 3 days. However, the navigation will be reopened outside of these times to allow the passage of boats.
This notice is to be read in conjunction with Restriction Notice 505
Canal & River Trust apologise for any inconvenience this may cause during this essential repair work.